Bridge in Korea
Bridge built by 548th Engineer SV BN, 2nd Engineer Construction GP in Korea during Korean War.
A heavily-laden truck is forced to by-pass this bridge on the Suwon-Seoul Highway, one of the spans of the bridge having been only temporarily repaired using crisscrossed railroad ties for support. This was during the Korean War.