View from office, Room 15 south, during renovation of the White House
View from office, Room 15, south through elevator hall into second floor corridor. The workmen are taking down the brick and circular iron frame of stairway installed in 1902.
View along north face of the White House near the northwest corner. The concrete shoring columns on this face have been completed except for the small area shown in the photograph. The stone here will be removed and the opening used for removing earth during excavation below the basement. The pipe which carries surface water from the roof, was re-laid farther to the north to permit this operation.
View of top opening of old cistern below the floor of the foyer on the east side of the White House. The view is to the north with entrance to lower corridor in background. This was revealed during the renovation of the White House.