West view of the third floor corridor of the White House during the renovation. Carpenters are laying finish floor of red oak in herring-bone design over sub-flooring.
View into North Hall from second floor corridor showing plaster shell above doorway and built in bookcases on the left. This was taken during the renovation of the White House.