View of tile flue openings during renovation of White House
View of tile flue openings in the large chimney at the southwest corner after sandstone blocks had been removed during the renovation of the White House.
West side of the White House from northwest corner during renovation. A large steel girder is being taken through the large arched window to the west end of the 2nd Floor Corridor by the truck crane.
East view of roof from above the South Portico showing sandstone blocks from large chimney near the southeast corner being lowered by the hoist. This was taken during the White House renovation.